Metro Line 1 Resumes Full Operation, Beilun District Lifts Control

According to the latest situation of the epidemic, since October 28, the section from Wuxiao Station to Xiapu Station of Ningbo Metro Line 1 has resumed operation, that is, the entire Line 1 has resumed normal operation.

[irp]

According to the provisions of the national “Novel Coronavirus Pneumonia Prevention and Control Plan (Ninth Edition)”, combined with the current epidemic prevention and control situation in Beilun District, the municipal and district leading groups for epidemic prevention and control have studied and decided that from 0:00 on October 28, 2022, all areas in Beilun District will lift silent management and fully resume normalized epidemic prevention and control measures.

THE END
喜欢就支持一下吧
点赞6 分享
0 Comments
Inline Feedbacks
View all Answers